A few pebbles

After a day of progress in the shop, Greg always says, “Another pebble off of Mt. Everest.” Today was a great day in the shop. We made progress… and all of it seemed to be FORWARD progress.

Greg started in on the last of the engine sensors, the Exhaust Gas Temperature (EGT) probes. We decided in what direction and location we wanted the probes. We also measured to keep the probes within the recommended distance from the cylinder and as consistent as possible on all four pipes. We had welds and elbows in the pipe to work around, but they are all close. Greg took off the pipes and drilled the #30 holes for the probes. A bit later, they are installed.

IMG_3186

IMG_3187

While he was working on that, I was cleaning up the bulkhead layup for the throttle and mixture cable mounts. I had to work around the wires that pass through the bulkhead, but everything is sanded and no sharp edges remain. The good news is that with the carbon in that layup, the bulkhead is very stiff. In fact i can move the airplane by grabbing on the bulkhead without any sign of relative movement. I thought maybe I would need stiffening ribs, but doesn’t seem like I do.

FullSizeRender 2

I reconnected the cables to the throttle and mixture levers. When I was testing the throws and rigging the cables, I was able to confirm something we observed when we were making the bulkhead. The mixture is capable of full throw at the fuel injection servo end before hitting the stops on the lever in the cockpit by about 1/8″ on the lever. This is pretty much ideal. The throttle, however, hits the stops on the lever slightly before it hits both the idle and full throttle stop on the fuel injection servo. The throttle lever is custom made, and apparently we weren’t as accurate in fabricating as we needed to be. First idea is to thin the throttle lever by 1/16″ on each side. This will give us more throw and we will still have plenty of meat left in the lever. If this isn’t enough, I can go a bit more. Worst case scenario, I make a new one, and move the attachment hole down by a fraction of an inch. Either way, it will be an easy fix.

While we were working on the throttles, we need to work on the slave tube attachment to drive the rear throttle. The pivot points on the front and rear throttle are different, so we need to do some trigonometry. It has been a while since both Greg and I have used trig, so it took a few times to get right, but we have the dimensions that we need. The goal here is to have the rear throttle actuate slightly less than 4″ while the front throttle actuates 4.1″ This will ensure that the rear throttle can never limit the front throttle from commanding full idle and full power. Tomorrow I should be able to take care of both of these issues.

FullSizeRender 3

The most exciting part of the day was fuel injection lines. With Greg’s help, I got two more fuel injector lines bent up and installed. For cylinders number 1 and 3. That means that 3 of the 4 cylinders have fuel, and only one more line will ‘complete’ the fuel system. I still have to add 2 or 3 adel clamps to secure the installed lines, but I am happy with the routing.

IMG_3188

The last cylinder is going to require me to order a new line. It is the simplest line to bend, and yet I still screwed up the measurement when I was ordering the lines. So I bent up a new welding rod template to measure and was sure to be accurate even clamping it in place. I should be able to have this one next week and call the fuel system plumbed!

IMG_3189

Lastly, I received a new configuration module for the G3X EFIS from Garmin. The new config module is required for bluetooth compatibility with iPhones and iPads. The config module is buried in the PFD connector. So I just had to disassemble the connector, replace the module, and reassemble. When I powered up the EFIS in setup mode, the new config module was recognized, and the Apple compatibility test passed. One of these days I will download the Garmin Pilot app and check out the connectivity.

IMG_3194

Tomorrow is another full day in the Garaggio, more to come.

2 thoughts on “A few pebbles

  1. Hi Joe, You may want to consider a grommet in the elliptical hole the cables and wires run through in the third photo down. Dave Fette

    1. Hi Dave – Those wires will be secured before and after the bulkhead to prevent chafing. I do have some silicone fusion tape that I could wrap around as an extra preventative measure. Thanks for keeping a close eye on the details. Hope you and Carol are well.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: