Made it home from work today, and still managed to get into the Garaggio. My plan was to put micro filler on the cowl repairs. And I did.
But that wasn’t all. While I was at work this week, I started making a list of the things that still need to get done. So I chose a few of those items on the list that were pretty quick to do tonight as well. That included drilling out the static port openings, lower left of photo.
As well as plumbing the pitot and static sources to the Garmin AHRS.
Here is the pitot tube connection.
And the Static port connection.
While I was working in the area, I bolted down the GTN650 antenna as well. Four things to check off the to-do list. Maybe we can check off a few more tomorrow.