Whittling away

Today was a day for whittling away at tasks to try to reverse the ‘one step forward, two steps back’ trend we have had lately.  Greg got a lot of work done on the new mount for the throttle and mixture cable. The goal was to transfer the stress of mounting the cables to aContinue reading “Whittling away”

Studly

I finished fabricating the mounting studs and installed them today. This allowed me to mount the fuel injection servo on the spacers and elbow that Airflow Performance made for me. I just need to get some lock washers and locknuts to finish the mounting. Maybe soon I can fabricate some hoses and do some plumbing.Continue reading “Studly”